Dyeing Unit

The total floor area in dyeing it is about 93000 sft Under Construction. Master Plan of machine set- up space, will be batch preparation, wet fabric storage. In order to dissipate the heat evolve from dyeing machines, the shed height has kept to av. 24ft. With enough window opening and air exhaust systems. The machine descriptions of this unit are as follows:
Name of MachineBrandCapacityM/C Qty.
Master Plan
As per gas capacity
SCLAVOS/Daniflow/MCS10 Kg220 kg
SCLAVOS/Daniflow/MCS25 Kg250kg
SCLAVOS/Daniflow/MCS50 Kg2100 kg
SCLAVOS/Daniflow/MCS100 Kg2200 kg
DyeingSCLAVOS/Daniflow/MCS250 Kg41000 kg
SCLAVOS/Daniflow/MCS500 Kg42000 kg
SCLAVOS/Daniflow/MCS750 Kg43000 kg
SCLAVOS/Daniflow/MCS1000 Kg22000 kg
SCLAVOS/Daniflow/MCS1500 Kg11500kg
StenterBruckner10 Chamber, Double Padder2
Squeezer /DewateringBIANCODOUBLE PADDER1
Equeezer DryerSantex/Canlar( 4 +1) CHAMBER,SINGLE PASS1
Tube CompactorTUBE TEX1
BACK SEWINGMTG1
SLITTING M/CBIANCODOUBLE PADDER2
OPEN COMPACTOR M/CLAFER2
AIR TURNING M/CMERSAN/BENES1
CalanderDong Name1
Tumbler Dryer75 Kg1
Total Capacity : 9870kg /Shift
Total Capacity: 19740kg/Day